Get ready for your design

Gather your ideas

Save photos of homes and rooms you like, and jot down what you need and what would be nice to have. Rough notes and sketches are welcome.

Think about size

Whatever you're building, it helps us to know the size you have in mind. That could be a width and depth for the outside of the building, or a square footage number you're aiming for or need to stay under.

Try this Not sure of a number? Make a list of the rooms you need and how you'll use them. We can work out the size with you from there.

Have a builder? Loop them in

If you already have a builder, some clients find it helpful to show them the first plans. You don't need a builder to get started with us.

02

Know where you can build on your lot

Find your property lines

Your property lines are the edges of your lot, where your land ends and your neighbor's or the street begins. Your deed and the plans recorded at your county's Registry of Deeds describe them.

Online maps from your town or the state show roughly where your lines are. The state says these maps aren't an official record of your boundaries, and only a professional land surveyor can map them exactly.

Try this Look up your lot on the Massachusetts Interactive Property Map to get a rough idea of its shape and size.

Know what a survey is

A land surveyor measures your land and marks your property lines on the ground. They can also draw a plot plan, a map of your lot that shows your property lines, your buildings and how far each building sits from each line. Some towns ask for a plot plan with your building permit.

A surveyor maps your land, and we draw your building.

The plot plan you may have received when you bought your house is often a mortgage inspection plan. It's made for the bank and isn't a survey.

Try this Ask your building department whether your project needs a plot plan from a surveyor.

Learn your setbacks

A setback is the shortest distance a building can be from your property line. Your lot has one for the front, each side and the back. Together they outline the part of your lot where you can build.

Every town sets its own setbacks, and they can change from one part of town to another.

Try this Once you know your zoning district, look up its setbacks in your town's zoning bylaw, or ask your building or zoning office.

Check your zoning

Zoning is your town's set of rules for what can be built where. The town is divided into zoning districts, and each district has its own rules, like what kind of building is allowed, how big a lot has to be, the setbacks and how tall you can build.

Try this Find your district on your town's zoning map, then read the rules for that district in the zoning bylaw. Most towns post both online.

03

Find out what your town reviews

Look for wetlands nearby

Wetlands, streams, ponds and rivers are protected by the state Wetlands Protection Act. Work within 100 feet of a wetland, or within 200 feet of a river or stream that flows all year, usually needs a review by your town's conservation commission.

Try this Check the state wetlands map for wetlands near your lot. If you see any, call your conservation commission.

Historic districts

If your house is in a local historic district, the historic district commission reviews changes to the outside of your house that can be seen from the street. When they approve, they issue a certificate so the work can go ahead.

Try this Ask your town whether your house is in a local historic district. If it is, let us know, and we can include the design details, finishes and colors the commission asks for on your plans.

Learn more from the state.

ADU rules

State law allows ADUs by right in single-family zones.

Try this Read our ADU page for the size limits and what your town can and can't require.

04

Check your septic system

Know how many bedrooms it allows

If your home is on septic, the system was designed for a set number of bedrooms. If your project adds a bedroom, your system has to be big enough for it.

Try this Ask your board of health how many bedrooms your septic system was designed for.

Find your tank and leach field

An addition or garage sits a set distance from your septic system, so it helps to know where the tank and leach field are. For a foundation with a basement or crawl space, the state minimum is 10 feet from the tank and 20 feet from the leach field. Your town can ask for more.

Try this Ask your board of health for a copy of your septic plan. It shows where everything is.

State septic rules, 310 CMR 15.211.

05

Planning a big addition?
Understand how stretch code could impact your project

Massachusetts has an energy code called the stretch code. It sets higher energy efficiency standards for new homes and additions, and most cities and towns in the state use it.3 It was first created in 2009 and updated in 20231 and again in 2025.2

Under the stretch code, an addition needs a home energy rating, called a HERS rating, if it's over 1,000 square feet or more than doubles the size of your home.2 Finishing a basement or attic you already have, without adding on to the outside of the house or changing the roof, doesn't need one.2

A certified HERS rater scores the whole house, your existing home and the addition together. A lower score means a more energy efficient home.4 If your score needs to come down to meet the code, the rater points out what would help, like more insulation or air sealing.5

Since 2025, the targets for additions are easier to meet than the ones for new homes.2

Try this If your addition is close to 1,000 square feet, tell us early. Then you can choose its size with the rating in mind.

  1. Stretch Energy and Specialized Code FAQ, Mass.gov.
  2. 225 CMR 22.00, Massachusetts Stretch Energy Code, as updated February 14, 2025. Mass.gov summary.
  3. Massachusetts Building Energy Code Adoption by Municipality, Mass.gov.
  4. What Is the HERS Index, RESNET.
  5. Stretch code guidance, Town of Westwood Building Department.
06

What else your project may need

Gaj Drafting LLC provides drafting and design services. During the planning stage, some projects also need the following from other professionals or town boards. These aren't part of our services:

  • Property surveys or property line locations
  • Site planning, including where you're allowed to build on your lot
  • Zoning, septic, wetland or historic district approvals
  • Engineering or stamped plans
  • Septic design, soil testing or structural testing

Plan ahead in older homes

Our measurements cover what's visible. In an older home, your builder sees what's inside the walls once work begins. Having your builder look during design gives them an early start on what they may find.

These tips are general information about Massachusetts rules as of October 2026. They aren't legal, engineering or surveying advice. Rules change, and your town's departments and boards decide what applies to your property.

Questions about your project?

Call or text us at 413-388-2617.

Get an Estimate